The RG mechanical systems (HVAC, conveyor line, and hydraulic press) were inspected on April 10–13, 2026. Overall, the systems are operational but require scheduled maintenance on the main air compressor (RG-AC03) and replacement of two worn bearings in Conveyor Line B. No immediate safety hazards were identified. Estimated downtime for corrective actions: 8 hours.